Since 1990, Jutraco Sdn Bhd has delivered industrial, civil and infrastructure projects across Sarawak — CIDB Grade G7, UPKJ Class B, and more than three decades of disciplined execution.
View Our WorkBuilding strong foundations to achieve enduring results since 1990.
For more than three decades, Jutraco Sdn Bhd has delivered construction projects across Sarawak — from industrial and civil works to complex design and build projects — through disciplined execution and practical engineering judgment.
We work closely with clients, consultants and stakeholders to understand project requirements and site conditions, applying practical solutions and sound engineering judgment at every stage.
Careful planning and thorough preparation create the basis for sustainable outcomes.
Disciplined processes, attention to detail and sound judgment drive our project execution.
Honesty and transparency guide our actions and strengthen trust.
Quality workmanship and appropriate solutions ensure long-term performance.
Collaborative relationships with our clients, partners and stakeholders lead to better results.
We deliver integrated construction solutions across key sectors, combining technical expertise, practical experience and disciplined project execution.
Housing complexes, commercial blocks and community facilities tailored to Sarawak's regional needs.
Site development, civil earthworks, subbase formulation and structural concrete paving for urban and rural networks.
Reinforced concrete foundations, effluent tank structures, pump sumps, blower rooms and heavy industrial paving.
Design and build of staff quarters, labour accommodation and facility buildings for remote and plantation sites.
Our credentials reflect our commitment to industry standards, regulatory compliance and professional integrity.
We continue to uphold the standards that underpin our industry and the trust placed in us by our clients, partners and stakeholders.
The following presents a selection of recent projects that demonstrate our capabilities, the quality of our work and the trust placed in us by our clients.
2026
2025
2025| Project | Client | Value (RM M) | Status |
|---|---|---|---|
| The Proposed Construction and Completion of Two Block 10-Door TKI Workers' Quarter at Durafarm Sdn. Bhd. (Estate) | Golden Gravel Resources Sdn Bhd | — | |
| The Proposed Construction and Completion of One Block 10-Door Staff Quarter at Durafarm Sdn. Bhd. (Estate) | Golden Gravel Resources Sdn Bhd | — | |
| Proposed Reconstruction of Concrete Slab at B60 Quartz Open Yard and C121 Sintering Plant, Including Concrete Covered Drainage Works at C121, at Lot 41, Kemena Land District, Samalaju Industrial Park, Bintulu | OM (Sarawak) Sdn Bhd | 3.30 | |
| Proposed Design and Build of 1 Block of 10-Door Staff Quarters at Durafarm Estate, Betong | Durafarm Sdn. Bhd | 0.93 | |
| Proposed Design and Build of 2 Blocks of 6-Door Labour Quarters at Durafarm Estate, Betong | Durafarm Sdn. Bhd | 0.87 | |
| Proposed EC Structure for New Effluent Polishing Plant, Treatment Towers, Pump Sump, Blower Room & Electrical Panel Room for Mukah Kilang Kelapa Sawit Sdn Bhd, Mukah | Mukah Kilang Kelapa Sawit Sdn Bhd | 0.53 | |
| Proposed Pavement Rehabilitation of Heavy-Duty Roadway from A02 to A03 & from A08 to A99, Installation of Traffic Bollard and Construction of Cable Trench Cover, at Lot 41, Kemena Land District, Samalaju Industrial Park, Bintulu | OM (Sarawak) Sdn Bhd | 1.32 | |
| Proposed Construction of 6 Units 2-Storey Building and 2 Units 2.5-Storey Building on Lot 4273, Block 207, KNLD, Lorong Kepayang 9, Jalan Kepayang, Kuching (Project Management Only) | Always Realty Sdn Bhd | 4.05 | |
| Design and Build — Proposed 10 Units Single-Storey Terrace Houses on Lot 180, Block 83, Kuching Central Land District, Kuching (In Collaboration with Always Realty Sdn Bhd) | Blessed Realty Sdn Bhd | 1.58 |
Project progress, milestones and corporate announcements.
Site works continue at the OM Materials project as the team prepares the warehouse floor for the next phase of construction.
View on Facebook →Jutraco has commenced construction of two blocks of 10-door TKI workers' quarters at the Durafarm Sdn Bhd estate in Betong.
View on Facebook →Jutraco has commenced the proposed reconstruction of the concrete slab at B60 Quartz Open Yard and the C121 Sintering Plant for OM Materials (Sarawak) Sdn Bhd at Samalaju Industrial Park, Bintulu.
View on Facebook →